Understanding Fec920s Jul 15 2016
Let's dive into the details surrounding Fec920s Jul 15 2016. 419LHF with empty hoppers and a center beam. EoT past MP236 at 4:41PM.
Key Takeaways about Fec920s Jul 15 2016
- 822812 taking the hot train to the south. EoT past MP236 at 7:33PM.
- 920 by mp236 at 8:49 with 413, load of ballast and 28 rock heading north to mp234. Anita and Caboose.
- 510 with a great sounding horn leading the Pineda Turn. EoT past MP236 at 8:10am.
- 438LHF with three work gons, a scrap gon, an empty lumber beam and three dozen empty hoppers. EoT past MP236 at 3:09PM.
- 419 with the Pineda Turn. EoT past MP236 at 8:22am.
Detailed Analysis of Fec920s Jul 15 2016
419 with the Pineda Turn. EoT past MP236 at 9:21am. 810821439lhf with the afternoon train. Meeting FEC101 at Palm Bay. EoT past MP236 at 5:42PM. 435LHF with the Pineda Turn. EoT past MP236 at 8:07am.
511LHF taking the loads into Bougard to meet the coal train.
That wraps up our extensive overview of Fec920s Jul 15 2016.