Exploring Fec920 May 9 2016
If you are looking for information about Fec920 May 9 2016, you have come to the right place.
- 441 with about 30 loads heading into the siding at Micco to meet FEC141. EoT past MP236 at 7:59am.
- 510LHF with about a dozen empties and a center beam from Port Sewall. Love those old scheme red and white chevrons AND ...
- 431 spreads ballast from the Herzog dumper at Indrio Team Track and backs up to spread the other side. EoT past MP236 at ...
- 920 by mp236 at
- 416 with ten gondola loads, twenty-seven hoppers and a box on the rear end. EoT past MP236 at 7:20am.
In-Depth Information on Fec920 May 9 2016
432 leads loaded rock hoppers through the junction past the surfacing gang waiting on the Indrio Team Track, EoT past MP236 at ... 411LHF with three side dumpers and about four dozen loads. EoT past MP236 at 8:46am. 418 with the Pineda Turn. EoT past MP236 at 8:14am. 431 with 35 loads going to work on a Monday morning, EoT past MP236 at 7:41am.
920 by mp236 at 8:49 with 413, load of ballast and 28 rock heading north to mp234. Anita and Caboose.
We hope this detailed breakdown of Fec920 May 9 2016 was helpful.