Introduction to Fec920 Jul 2 2019
Welcome to our comprehensive guide on Fec920 Jul 2 2019. 431 with twenty-eight cars for Lake Washington at MP188. EoT past MP236 at 7:07am.
Fec920 Jul 2 2019 Comprehensive Overview
429 with eleven hopper loads for the Lake Washington Cemex facility at MP188. EoT past MP236 at 6:57am. Pink Lady425 howling to pull a lumber beam and twenty-seven loaded hoppers on the Pineda Turn. EoT past MP236 at 8:47am. 415 with a gon full of ties, about fifty rock loads and a covered hopper on the rear end. EoT past MP236 at 8:32am.
428 with sixty-five loads on the Pineda Turn. EoT past MP236 at 8:28am.
Summary & Highlights for Fec920 Jul 2 2019
- 815300812 on the way to swap with FEC109 at Micco. EoT past MP236 at 6:42am.
- Pink Lady425 howling to the north with twenty-seven loads for MP188. EoT past MP236 at 7:07am.
- 508LHF headed to MP188 to work the Lake Washington facility. EoT past MP236 at 7:36am.
- 431 with twenty-seven cars heading for Winter Beach and MP188 on the Pineda Turn. EoT past MP236 at 7:03am.
- 431 with three work gons, fifty-
In summary, understanding Fec920 Jul 2 2019 gives us a better perspective.