Introduction to Fec920 Jan 21 2016

Welcome to our comprehensive guide on Fec920 Jan 21 2016. 427LHF from Port Sewall going to Gifford. EoT past MP236 at 12:18PM.

Fec920 Jan 21 2016 Comprehensive Overview

419LHF with two lumber beams and 30 loads on the Pineda Turn. EoT past MP236 at 7:59am. 507LHF with four dumpers and about forty loads heading into Bougard to await FEC109. EoT past MP236 at 7:49am. 433LHF with eleven loaded hoppers. EoT past MP236 at 7:21am.

421 light engine move from FO to Bougard. EoT past MP236 at 1:16PM.

Summary & Highlights for Fec920 Jan 21 2016

  • 414 taking orders and leading 27 loads to work on a cool Monday morning.
  • 413 with a lumber beam and four dozen loads. Meeting FEC141 at Bougard. EoT past MP236 at 7:55am.
  • 435LHF with one box and four dozen loads proceeding to the stop for broken rail eight miles north of us. EoT past MP236 at ...
  • 821804 with IM and auto racks. Eot past MP236 at 7:48am.
  • Pink Lady 436 dragging empty hoppers, jet engine car and two propane tankers to Gifford. EoT past MP236 at 2:21PM.

In summary, understanding Fec920 Jan 21 2016 gives us a better perspective.

Fec920 Jan 21 2016.pdf

Size: 12.72 MB · Format: PDF · Secure Download

Download PDF Read Online

Related Documents