Introduction to Fec101 Sep 1 2012

Exploring Fec101 Sep 1 2012 reveals several interesting facts. 106 and 100 leading all IM past the ancient Fellsmere Railroad just running 40mph. EoT past MP215 at 7:04PM. cabooseMikey ...

Fec101 Sep 1 2012 Comprehensive Overview

Looking for Willie and Ray on their rounder as dusk turns to night. Monster long train struggling all the way. 100 and 101 with ... Steve with a long train tonight taking the roll-by from Jim at Micco. Paired 102 and 142, 415LHF with racks ahead of the IM. ECH grinning from the tread of paired 105 and 142 with 419 leading racks and IM to the meet in Gifford. Red Crete billboard in ...

Steve swapped and heading home on paired 107 and 104 just as we pull onto our train watching spot. Glad we made it. EoT past ...

Summary & Highlights for Fec101 Sep 1 2012

  • Steve and Tony heading for their weekend on 100 and 101, 702LHF with all IM. Meeting FEC202 at Gifford, long train running ...
  • Steve and Tony heading for the meet at Gifford. The mud spot at 215.7 has been worked on today and a winrow of fines line the ...
  • Hustled down to the FEC Museum site in FOrt Pierce to see Jim and the ECH along with my buddy Mr. Jake Smith who watched ...
  • Willie and Ray on the rounder with 100 and 101 and all IM. EoT past MP216 at 7:24PM.
  • Paired 107 and 104, 710LHF with a long train of IM running restricted speed across the work zone. EoT past MP216 at 6:27PM.

Stay tuned for more updates related to Fec101 Sep 1 2012.

Fec101 Sep 1 2012.pdf

Size: 14.69 MB · Format: PDF · Secure Download

Download PDF Read Online

Related Documents