Introduction to Fec101 August 19 2011

Let's dive into the details surrounding Fec101 August 19 2011. Mark crowding the cab window behind Tug with a white towel wave. Lots of IM, the good stuff on this train and they are gone by at ...

Fec101 August 19 2011 Comprehensive Overview

On our spot just before six PM looking for the ECH to bring 101 our way. A scary lot of empties on this train, come on more IM. PHI AT WAS - ECH giving us the big wave from the BigBlue CITX140 with a fine train trailing lots of pigs to the south of Caboose Junction at ...

Willie and Ray urging the Citx140 hard to the south ahead of 105 and a fine string of IM. Some WalMarts in with the brown guys ...

Summary & Highlights for Fec101 August 19 2011

  • They ve got a fine train of stacks, double stacks and pigs past us at MP216 doing close to Limited Speed. Lots of brown guys on ...
  • OH, that is a long one and all IM, just a few empty slots on this train moving about 40mph and gaining as he goes. 103 and 106 up ...
  • FEC101
  • CLE AT DET -
  • PHI AT WAS -

That wraps up our extensive overview of Fec101 August 19 2011.

Fec101 August 19 2011.pdf

Size: 11.30 MB · Format: PDF · Secure Download

Download PDF Read Online

Related Documents